Application Reference
Wind Energy
CLS and WGCS of Pitch Bearing
Manufacturer: Gold Wind
Wind Turbine: 1.5 MW
Installation Date: 2018.07
Project For: Pitch Bearing (CLS + WGCS)
- The Location of pump.
- The location of power pump.
- The location of monitor.
- the location of distributor.
- The location of tube and wire harness.
- Suction & Discharge Device.
- Waste grease collection.
- Lube Points.





























